Katikati Action Centre

This new indoor stadium provides sports stadium for both the school and the public of Katikati.

Constructed with a steel frame and light cladding the stadium has a timber sprung floor and attached amenities area.

Designed by Aptus Architecture the complex was valued at some $1.6 Million and completed in 2004.

Address:
Beach Road, Katikati
Cost:
$1.65 Million
Client:
Katikati College Board of Trustees
Build Time:
31 Weeks
Completed:
June 2004
Contract Type:
NZS:3910:1998
 
Architect:
Aptus Architecture Ltd
Structural:
Warren Clarke Ltd
Mechanical:
Micon
Electrical:
Micon
 
Project Manager:
Elton Verran
Site Manager:
Lyndsay Rouse
Quantity Surveyor:
Damian Pootjes


  PRINTABLE VERSION TOP
 
News

Beating the R word
With the second issue of our newsletter I felt I should try to contribute something by way of an update on the group as a whole. All the doom and gloom talk in the media makes it easy to slip into a negative mode and await the end of the big R, but that’s not what I would like to see, nor indeed what is going to happen to us... Read more »

View all news articles »

Recent Successes

Click Clack Ltd
Fast Track Project that included the extension and reinvigoration of an existing tired Office space to accommodate an amalgamation of 2 separate Office buildings into one bright and fresh working environment... Read more »

View all success stories »

Home About Us News Recent Successes Downloads Recruitment Contact Us
site safe New Zealand Green Building Council Registered Master Builders
Designed, Developed & Powered by EFX Group (NZ) Limited© Copyright 2009. McMillan & Lockwood