Mount College Administration Building

Designed by Thorn Stevenson this new complex was completed in 2002 and was valued at $1.4 Million.

Constructed in the centre of an existing school, the complex was a single storey structure constructed to house both staff and administration area for the school.

The building has distinctive point finishes and art work to the entrance way in keeping with providing a sympathic environment for both the staff and pupils.

Address:
Maunganui Road, Mount Maunganui
Cost:
$1.4 Million
Client:
Ministry of Education
Build Time:
8 Months
Completed:
October 2002
Contract Type:
NZS:3910
 
Architect:
Thorn Stephenson Architects
Project Manager:
Barry Robin
Site Manager:
Owen Burford
Quantity Surveyor:
Stephen Hope
 


  PRINTABLE VERSION TOP
 
News

Beating the R word
With the second issue of our newsletter I felt I should try to contribute something by way of an update on the group as a whole. All the doom and gloom talk in the media makes it easy to slip into a negative mode and await the end of the big R, but that’s not what I would like to see, nor indeed what is going to happen to us... Read more »

View all news articles »

Recent Successes

Click Clack Ltd
Fast Track Project that included the extension and reinvigoration of an existing tired Office space to accommodate an amalgamation of 2 separate Office buildings into one bright and fresh working environment... Read more »

View all success stories »

Home About Us News Recent Successes Downloads Recruitment Contact Us
site safe New Zealand Green Building Council Registered Master Builders
Designed, Developed & Powered by EFX Group (NZ) Limited© Copyright 2009. McMillan & Lockwood