McMillan & Lockwood
Home About Us News Recent Successes Downloads Recruitment Contact Us

Click Clack Ltd

Fast Track Project that included the extension and reinvigoration of an existing tired Office space to accommodate an amalgamation of 2 separate Office buildings into one bright and fresh working environment.

Value of work $500,000, comprising demolition of existing street façade and existing toilets and construction of a new extension and new office space within the existing warehouse structure.

Client:
Click Clack Ltd
Architect:
Graham Allen Architects Ltd
 


  PRINTABLE VERSION TOP
 
News

Beating the R word
With the second issue of our newsletter I felt I should try to contribute something by way of an update on the group as a whole. All the doom and gloom talk in the media makes it easy to slip into a negative mode and await the end of the big R, but that’s not what I would like to see, nor indeed what is going to happen to us... Read more »

View all news articles »

Recent Successes

Light Armoured Vehicle Regiment (LAV)
The Light Armoured Vehicle Workshop was completed on July 2010 for NZDF on time and on budget. The building was founded on piles which were incorporated into the design after significant value engineering was undertaken by McMillan & Lockwood... Read more »

View all success stories »

Home About Us News Recent Successes Downloads Recruitment Contact Us
site safe New Zealand Green Building Council Registered Master Builders
Designed, Developed & Powered by EFX Group (NZ) Limited© Copyright 2009. McMillan & Lockwood