This
contract involved constructing a first floor structural on top of some
existing classrooms and then in filling and refurbishing the ground
floor areas.
This was to be achieved without exposing the existing classrooms to
weather damage requiring the first floor area to be constructed with
as much existing roof as possible being left in position. Completion
in 2005 the building was valued at $2.3 Million and designed by Aptus
Architectures Ltd.
|