Katikati Action Centre

This new indoor stadium provides sports stadium for both the school and the public of Katikati.

Constructed with a steel frame and light cladding the stadium has a timber sprung floor and attached amenities area.

Designed by Aptus Architecture the complex was valued at some $1.6 Million and completed in 2004.

Address:
Beach Road, Katikati
Cost:
$1.65 Million
Client:
Katikati College Board of Trustees
Build Time:
31 Weeks
Completed:
June 2004
Contract Type:
NZS:3910:1998
 
Architect:
Aptus Architecture Ltd
Structural:
Warren Clarke Ltd
Mechanical:
Micon
Electrical:
Micon
 
Project Manager:
Elton Verran
Site Manager:
Lyndsay Rouse
Quantity Surveyor:
Damian Pootjes