McMillan & Lockwood

Fraser Cove Shopping Centre

  • Designed for IMF (Fraser Cove) the complex was built in 3 stages consisting of:
  • Stage 1: Warehouse (being one of the largest in NZ)
  • Stage 2: Retail shopping units & office accommodation.
  • Stage 3: Retail shopping units & gym.

With a total value of $8.5 million extensive shop fitouts were included in the contract.

Many challenges were overcome to complete the total contract on time.

Excellent team work from all parties resulted in a successful working relationship being formed and continued for the duration of the 3 stage contract.

Block A Extensions:

Address:
Fraser Street, Tauranga

Cost:
$8.5 Million
Client:
I.M.F Fraser Cove
Build Time:
(Three stages) Total - 18 Months
Completed:
(Final stage) December 2004
Contract Type:
NZS:3910
 
Architect:
R.C.C
Structural:
Thorne Dwyer
Electrical:
Electrical Consulting Services
Fire:
Fire Protection Services
   
Project Managers:
Alan Benjamin
Don Quarrie
Site Manager:
Don Quarrie
Quantity Surveyor:
Project Economics
Damian Pootjes